The King’s School

  • Client

    Vinci Construction UK Ltd

  • Pool Type

    Indoor Deck Level Pool

  • Sector

    Education

  • Location

    Macclesfield, Cheshire

Designed and built in collaboration with Vinci Construction, this 25 x 13m private school swimming pool was created to provide a high-performance facility for training, competitions and gala events. Constructed to meet all ASA standards, the pool delivers a versatile environment for both recreational and competitive swimming.

Finished in Spectile Agrob Buchtal Chroma Pool tiles, the pool is fully equipped with competition-standard equipment and incorporates a high-level automatic heat retention cover system to improve energy efficiency and reduce operating costs.

Quality assurance was a key priority throughout the project. Buckingham Pools delivered a comprehensive design and build solution, assuming full responsibility for the construction of the pool shell using the shotcrete method. This approach enabled the precise tolerances required to exceed those typically achieved with traditional concrete construction, ensuring long-term durability, reliability and full compliance with the project specification.

 

The completed facility provides the school with a modern, competition-ready swimming pool built to the highest standards of engineering, craftsmanship and performance.