Buckingham Pools were successfully appointed to carry out a fully managed Design and Build service for a bespoke wellness suite. The construction commenced in October 2022 and is now underway, comprising an indoor 12m x 5m pool, sauna, steam room and a feature shower. Our Contracts Manager Richard Sharman and his team of engineers faced the considerable challenge of adopting a reversed methodology with both shell construction and pipework installations. We were required to fix the pipeworks before building an encased shell within a ready-built concrete box by the main contractor (to hold large structural pillars).
Reversing Buckingham Pools’ traditional building method meant our team was required to restructure an individualised programme around the existing box. Further, as a commercial project, the strict process prompted additional paperwork and an intrusive level of detail, impacting the scheduled timeframe. Nevertheless, the pipeworks effectively configured between the two bodies, the shell and the first fix, are now signed off for the next stage of render and screed.