Stoke City F.C. Training Ground
Client
Speller Metcalfe
Pool Type
Indoor Skimmer Pool, Hydrotherapy Pool; Plunge Pool
Sector
Leisure | Sports
Location
Stoke-on-Trent
Buckingham Pools were appointed by Speller Metcalfe to Design and Build a specialist hydrotherapy and wellness facility, forming part of a wider high-performance training and recovery environment at Stoke City F.C. training ground, Clayton Wood. The development brings together advanced sports science, medical and wellbeing spaces, including a hydrotherapy suite, cryotherapy chamber, performance gym and athlete recovery zones. Designed to support elite-level conditioning, the facility delivers a purpose-built environment where performance, rehabilitation and recovery are seamlessly integrated.

At the core of the project is a 12m x 4m specialist hydrotherapy pool, with a variable depth ranging from 1.2m to 2.6m, engineered to support a wide range of rehabilitation and conditioning protocols. The pool is equipped with Endless Pools underwater treadmills and resistance systems, alongside EWAC Medical bicycles. These integrated systems enable controlled, low-impact exercise, allowing athletes to maintain cardiovascular conditioning while reducing stress on joints and soft tissue. An underwater camera system further enhances the facility, providing real-time biomechanical analysis to support injury prevention and performance optimisation.
Complementing the main pool are dedicated hot and cold therapy pools, measuring approximately 5.3m x 2.5m and 2.5m x 1.2m, respectively, alongside a sauna to complete the thermal suite. The hot pool promotes muscle relaxation, improved circulation and accelerated recovery, while the cold pool supports inflammation reduction and muscle repair through contrast therapy protocols. Together, these facilities form a comprehensive recovery circuit, widely recognised in elite sport for enhancing performance longevity, reducing injury downtime and supporting overall athlete wellbeing.

Backed by a state-of-the-art plant room incorporating advanced filtration and UV water treatment, the facility has been engineered for performance, efficiency and reliability. Delivered through a collaborative design and build approach, the project showcases Buckingham Pools’ expertise in creating technically advanced, performance-led aquatic environments. The facility is underpinned by a state-of-the-art plant room, designed and engineered to ensure optimal water quality, efficiency and reliability.
Advanced filtration systems are combined with a UV water treatment solution, delivering superior disinfection while reducing chemical dependency. The mechanical and electrical installation has been carefully coordinated to meet the rigorous demands of a high-usage, performance-led environment, ensuring consistent operation and ease of maintenance.
Through close collaboration with the wider project team, Buckingham Pools delivered a fully integrated solution that aligns with the client’s performance objectives. From early-stage design development through to final commissioning, our team provided technical expertise, precision engineering and a deep understanding of hydrotherapy environments. The result is a future-focused facility that reflects the growing importance of scientifically driven recovery in professional sport—combining innovation, durability and performance-led design to create a space that works as hard as the athletes it supports.














