At the core of the project is a 12m x 4m specialist hydrotherapy pool, with a variable depth ranging from 1.2m to 2.6m, engineered to support a wide range of rehabilitation and conditioning protocols. The pool is equipped with Endless Pools underwater treadmills and resistance systems, alongside EWAC Medical bicycles. These integrated systems enable controlled, low-impact exercise, allowing athletes to maintain cardiovascular conditioning while reducing stress on joints and soft tissue. An underwater camera system further enhances the facility, providing real-time biomechanical analysis to support injury prevention and performance optimisation.
Complementing the main pool are dedicated hot and cold therapy pools, measuring approximately 5.3m x 2.5m and 2.5m x 1.2m, respectively, alongside a sauna to complete the thermal suite. The hot pool promotes muscle relaxation, improved circulation and accelerated recovery, while the cold pool supports inflammation reduction and muscle repair through contrast therapy protocols. Together, these facilities form a comprehensive recovery circuit, widely recognised in elite sport for enhancing performance longevity, reducing injury downtime and supporting overall athlete wellbeing.










