Buckingham Pools are thrilled to be involved with Tilbury Douglas Construction and AHR Architects Ltd in the county’s most competitive project within the educational sector. We are pleased to announce that our appointed scheme included a tailor-made 6m x 4m hydrotherapy pool finished with anti-slip tiles to provide SEND students the opportunity to exercise and experience healthy hydrotherapeutic benefits.
The steel handrails fitted on all four sides of the pool and ribbed tile finished entry steps ensure easy access and safe usability for all pupils. It incorporates fast filtration, UV disinfection, and a water heating system to maintain regular hygiene and temperatures up to 34°C, to maximise the advantages of hydrotherapy.







